
Applicable Industries: Â
The Fast Change Temperature Testing Equipment Double Duty Thermal Shock Test Chamber is used to test material structures or composite materials by exposing them to extremely high and low temperatures in a continuous environment. This allows for the evaluation of thermal expansion and contraction caused by chemical and physical changes within the shortest possible time. The equipment is suitable for testing various materials such as metals, plastics, rubber, electronics, etc., providing a basis for product improvement and reference.
Inner size selection
Model | XB-OTS-50 | XB-OTS-80 | XB-OTS-150 | XB-OTS-225 | XB-OTS-408 |
Inner Size WxHxD (cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 |
External Size WxHxD (cm) | 138x180x155 | 150X190X160 | 190x200X195 | 210x220X205 | 225x250x220 |
Features:
*.High-quality appearance, with an arc-shaped body, matte stripe processing, and flat handle for easy operation and safe use.
*.Multi-layer rectangular glass viewing window with anti-sweat heater device to prevent condensation, water droplets, and maintain internal lighting with PL fluorescent lamps.
*.Door with sealed packing to effectively isolate internal temperature leakage.
*.Compressor system uses France Tecumseh brand, which can effectively remove oil from the condenser pipe and capillary tube, and uses environmental protection refrigerants (R23, R404, R507).
*.Controller uses imported LED display screen, showing measured values and set time.
*.Controller with multi-segment program editor, allowing fast (QUICK) or slope (SLOP) control of temperature and humidity.
*.Built-in mobile wheels for easy movement and positioning with strong fixing screws.
Detail Specification
Shock Temperature range | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 90min | ||||
Temp recover time/change time | ≤5min / ≤10sec | ||||
Temp control accuracy/ | ±0.5°C / ±2.0°C | ||||
distribution accuracy | |||||
Inner materials | SUS 304# stainless steel plate for inner chamber, and stainless steel plate + spray painting for external chamber. | ||||
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. | ||||
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. | ||||
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / hermetic two-stage compressor (air-cooled). | ||||
Safety devices | Fuse switch, high and low pressure protection switch compressors, refrigerant pressure protection switch failure warning system, electronic siren. | ||||
Fitting | Outlook window (special purchase), upper and lower adjustable compartment two energized measured line hole, casters, level bracket. | ||||
Power | 3 phase AC 380V 50HZ/60HZ | ||||
Controller | Tanwan TATO or TH900C | ||||
Compressor | Germany Bitzer Brand |
GB11158 Â Â GB10589-89 Â Â Â GB10592-89 Â Â Â GB/T10586-89 Â Â GB/T2423.22-2001 Â GB/T2423.1-2001 Â GB/T2423.2-2001 Â Â GB/T2423.3-93 Â Â Â GB/T2423.4-93 Â Â Â ASTM D1735 Â EIA - 364-59Â Â Â IEC60068-2-1.1990 Â Â IEC60068-2-2.1974 Â Â Â Â IEC 68-2-30Â Â Â Â IEC68-2-03Â Â Â Â EIA - 364-31C
Product View Of Fast Change Temperature Testing Equipment Double Duty Thermal Shock Test Chamber
Packing & Shipping
About US

Our Services
We are here to help you. Services available:
Replacement manuals
- Consumables and replacement parts
- On-site maintenance and repair
- Warranty support
- Over-the-phone service support and advice
If you have an OTS chamber, we will do our best to help you in whatever way we can. Â
 Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.
- Service repair:Â Â We prefer you contact us directly at the factory with any problems you may be experiencing. We help diagnose the problem, arrange for any needed parts, and schedule a technician to do the repairs. Rarely can a local contractor get all that done for you as quickly as we can. We also guarantee the work.

FAQ
Q1 : Â Can you customize the product?
  A:  Yes, we can customize any products according to your requirements.
Q2 : Â How to choose the most suitable products?
  A:  Our professional team will give you the best suggestion, just be patient to tell us the information about the parameters you require.
 Q3 :  Can you arrange installations and commissioning in your lab?
  A:  Firstly, for standard chambers, we have 3-5 days of commissioning before shipping, you just need to connect power in your lab, then you can start operating.
   Secondly, we provide detailed operation manuals with each chamber, so you can find and solve any issues yourself.
   Thirdly, for some customized chambers, we can come to install and teach your team how to operate.
Â
If you want to know more information...
 Please leave a message below and click " SEND "
Thanks for your time and attention! Thank you!
Extruded Fin Tube,Extruded Fin Pipe,Aluminium Extruded Fin Tube,Copper Extruded Fin Tube
Simcan Industrial Equipment Co.,Ltd. , https://www.simcanindustry.com