Daqing Petrochemical Relief Diesel Train Goes to Weinan

At 23 o'clock on May 18th, the Daqing Petrochemical Company's disaster-relief diesel train set out from the refinery's loading plant and headed to Weinan, Shaanxi.

At 18:10 on May 18, Daqing Petrochemical refinery loading plant received instructions from the company that it would deliver 2,000 tons of diesel fuel for disaster relief on time at 23 o'clock in the factory. In the face of serious political tasks, refinery employees showed a high degree of Sense of responsibility. In order to ensure safe delivery of the oil products under quality conditions, the monitor leader Yu Feng personally changed the process and copied the vehicle number. The operator strictly complied with the requirements of the temporary loading and unloading plan and reinstalled the anti-static grounding equipment for each tanker installed. Each tanker was installed five tankers. After a fight, prevent the tanker from slipping and ensure safe loading. At 19:40, the horizontal operation of the aluminum crane pipe with six diameters of Dg200 loading on the three trestle bridge suddenly failed. After an emergency study, it was decided to immediately adopt the reverse operation method. Although the opposite operation method brought more difficulty to the operating staff, but with the active cooperation of the staff, at 21:17, the loading task was completed nearly 2 hours in advance.

In order to ensure the quality of diesel fuel for disaster relief, this plant produces diesel-powered devices, strictly controls operating indicators, adjusts operating data in time, and operates smoothly. In the 0th diesel blending process, operators strictly followed the operating procedures to conduct timely tests on the components of the oil and reconcile them in time so that the diesel can reach the standard of No. 0 diesel, so that the disaster-stricken compatriots can use the assured oil.

It is reported that the special trains have sent oil products to various disaster areas.