141 Hualing heavy trucks ready to go to Algeria


On July 13th, as the last Xingma Kama tractor pulled into Shanghai Haitong International Terminal slowly, Algeria’s last order for the first half of 2010 was 141 vehicles (including 130 Star Kemah and 11 Hualing Heavy Truck). All arrived at the port. After careful inspection by my Shanghai Technical Service Department, I was ready to go to Algeria.

This year is the last year of Algeria's five-year plan. Basically all projects have been completed. If the East-West Expressway has been completed and opened to traffic, the demand for construction machinery and vehicles will be greatly reduced. At the same time, due to the rapid development of its domestic logistics industry, the demand for tractors has suddenly increased. Hualing dealers spotted this market in advance and were ready to increase the inventory of tractors. Various models and configurations have fully met the needs of customers and quickly occupied a considerable part of the logistics market. Following the delivery of 20 Xingama Kama tractors to Algeria in April, the market responded very well, with comfortable driving, atmospheric appearance, abundant power and high cost performance. Many customers were distressed not to mention the car. . This time Algeria dealers ordered one-hundred-hundred Star Kemah tractors, the largest number of Star Kaymars ordered at home and abroad.

For the timely delivery of these vehicles and the timely delivery of Algerian markets, Valin used almost all of its strength to improve vehicle design, improve overall vehicle quality, shorten lead times, and achieve perfection in every aspect. From the beginning of the contract review, the Technical Department of the Ministry of Technology strictly checks; to the production stage, the Ministry of Production Quality Department fulfills its responsibilities; to the departure of the Storage and Transportation Department at the time of dispatch; and finally to the port, technical service department regardless of the heat and heat, meticulous strict inspection Vehicle, do not let go of a defective car. All this shows that Hualing people are responsible for their duties, conscientious work attitude and selfless dedication.

Hoisting Mechanism And Spare Parts

A Tower Crane has three main mechanisms, that is hoisting mechanism, slewing mechanism and trolleying mechanism.

Hoisting Mechanism and Spare Parts mainly include Tower Crane Lift Motor ( Tower Crane Hoist Motor ), Tower Crane Axial Fans, Tower Crane Hoisting Reducer, Winding Drum, Steel Wire Rope , Safety Brake and other related spare parts. The mechanism has the advantage of compact structure, stable operation, low noise and long service life, ect.

Other spare parts for tower crane: Steel Structure ( Mast Section , Fixing Angle , Anchorage Frame ,etc.), Tower Crane Cabin , Load Moment Indicator , Tower Crane Telescoping Hydraulic System, Tower Crane Gear , Brake Disc , Wire Rope, Tower Crane Power Cable, Electric Parts , Tower Crane Pulleys , Tower Crane Control Console


Hoisting Mechanism,Tower Crane Lift Motor,Tower Crane Axial Fans,Tower Crane Hoist Motor, Tower Crane Hoisting Reducer

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.syconstructionhoist.com