Tiankang introduced the installation requirements of thermal resistance

Thermal resistance measurement points require:
1. The installation location of the thermal resistance needs to be selected in a location that is convenient for construction and maintenance and is not easily damaged by outside.
2. The mounting position of the thermal resistance should be kept as vertical as possible to prevent the protection tube from being deformed at high temperatures.
3. In the case where the measured medium has a flow velocity, it should be placed on the center line of the pipe and be opposite to the direction of the fluid to be measured.
4, there should be bent to be installed in the pipe bend.
5. When it is necessary to install horizontally, it should be supported by a bracket made of fire-resistant clay or heat-resistant metal, and the outlet hole of the terminal box should be downward to prevent water vapor and other substances from infiltrating due to poor sealing.
6, can withstand the pressure of the thermal resistance , the sealing surface must be sealed.
7. The insertion depth of the thermal resistance can be determined according to the actual situation, but the length of the immersion in the measured medium should be greater than 8 to 12 times the outer diameter of the protection tube.
8. The part of the thermal resistance exposed outside the equipment should be as short as possible and thermal insulation should be added to reduce heat loss and measurement error.
9. When the thermal resistance is installed on the negative pressure pipeline or container, the installation needs to be sealed well.
10. The cover of the thermal resistance junction box should be as far as possible to prevent it from being immersed in water.
11. When the thermal resistance is installed in a medium with solid particles and high flow rate, a protective plate may be installed in front of it to prevent damage due to long-term erosion.
12. When the thermal resistance is installed on the pipeline, the socket must be installed on the pipeline. The socket must be firmly connected with the pipeline and the materials must be the same.
Anhui Tiankang will always adhere to the "TaiKang spirit of transcending excellence," and on the basis of creating a harmonious enterprise, it will continue to grasp the pulse of market development, actively seek economic strategic alliances, and continue to work for the revitalization of national industries. Welcome customers to negotiate.