Fuling will build the largest intensive auto parts production base in South China

On January 26, 2011, the Liling Auto Parts Industrial Park in Hunan was formally laid. Hunan Yuanchuang, Hunan Fufeng, Hunan Quansheng, and Hunan Xingyue four auto parts production projects were started at the same time.

It is reported that the four projects started construction are the first to lag behind Luling Auto Parts Industrial Park, with a total investment of 460 million yuan and an area of ​​320 mu. It is estimated that the annual output value will be 1.9 billion yuan, tax will be turned over to 150 million yuan, and 2300 jobs will be created. One can be put into production as early as June 2011.

The Auto Parts Industrial Park Project is a large-scale manufacturing industry project established by the Liling Municipal Committee and the municipal government to cultivate the new economic growth pole in Liling. The project takes Changzhutan revitalization and development of automobile manufacturing industry as an opportunity, relying on the unique geographical advantages of Fuling, and plans to build a production-oriented auto parts and auto supplies, as well as automotive logistics, automotive commerce, vehicle maintenance, and after-sales services. , long-distance automobile vehicle manufacturing as one of the characteristics of the automotive industry park. The project site is located in the Fuling Ceramics Industrial Park, adjacent to the Shanghai-Kunming Expressway and the 320 National Highway. The planning and design are carried out according to the requirements for the development of a “two-type society” and the development of a low-carbon economy. The first-phase planning area is 2,200 acres.

The development of the auto parts industry and the establishment of new industrial clusters are major strategic measures that Liling City undertakes the transfer of its peripheral industries, advances its industrial strength in an all-round manner, and further changes its mode and structure, urging the “strateging into one hundred, scientific leapfrogging”. It is planned to use 2-3 years to form an industrial cluster of automobile parts and accessories worth 30 billion yuan, build a billion-dollar park within 5 to 8 years, build the third largest emerging pillar industry after ceramics and fireworks, and strive to build the largest in Central South China. The intensive automotive parts and automotive supplies production base. In June 2010, Liling signed a cooperation agreement with BAIC Group. Hunan Yuanchuang, Hunan Haofeng, Hunan Quansheng, Hunan Xingyue and other auto parts enterprises have successively entered the park. The foundation of the auto parts industrial park has opened up a splendid journey for the development of auto parts industry in Liling City.

Water Source Heat Pump
Cooling capacity: 10kW-130kW.

Characteristics
1.Panels and frame are made from galvanized steel protected with polyester powder painting to ensure total resistance to atmospheric agents.
2.Hermetic compressor. Single phase (mod. 10, 12,15) and 3-phase (mod.17 to 130) scroll type compressors, with built-in thermal overload cut-out and crankcase heater, mounted on rubber vibration dampers.
3.Evaporator. High efficiency plate type heat exchanger, factory insulated with flexible close cell material.
4.Condenser. High efficiency plate type heat exchanger, factory insulated with flexible close cell material.
5.Desuperheater High efficiency stainless steel brazed plate heat exchanger, factory insulated with flexible close cell material.
6. Refrigerant circuit. Copper tube connection with charge valves, filter drier, thermostatic expansion valve (capillary for mod.10 to 15), gas-liquid separator, high pressure switch and low pressure switch. The heat pump units are complete also with 4-way valve and one way valve.
7.Hydraulic circuit. Built with user side and source side water inlet/outlet connectors, water discharge connectors, air vent valve (mod.10 to 30 the user side is complete also with expansion vessel, water pump and flow switch. )
8. Electric panel. Consists of:
♦ Compressor contactor
♦ Compressor protection breaker
♦ User side water pump contactor (for mod.10 to 30)
♦ User side water pump breaker (for mod.10 to 30)
♦ Microprocessor with function display


9.Optional
♦ Sight glass which must be installed in factory
♦ Source side flow switch
♦ Source side water pump
♦ Anti-vibration rubber
♦ Metallic filter for the water circuit
♦ Heat recovery exchanger

♦ Tube in tube heat exchanger

Water Source Heat Pump UnitWater Source Heat Pump Air Conditioner

Water Source Heat Pump

Water Source Heat Pump,Water Source Heat Pump Unit,Packaged Water Source Heat Pump,DG Heating Cooling System

Jinan Amrta Air Conditioning Co.,Ltd , http://www.amrtaac.com