Highest Overall Hoisting Equipment in Place for Fused Vinylene Project

On July 31, after the typhoon, blue sky was washed. Good news came from the construction site of Fujian Refining and Ethylene Integration Project. The highest equipment in this project was successfully hoisted in place at 16 o'clock in the afternoon, and at the same time hit the record of the highest hoisting height of large-scale equipment in China.
This large-scale equipment is the No. 2 propylene distillation column C40406 of the ethylene unit of the integrated project. The overall lifting height is 110.3 meters, diameter is 6.4 meters and weight is 1075 tons. In order to ensure the smooth lifting of the tower, the major equipment hoisting general contractor Sinopec Ningbo Engineering Company has reviewed and revised the hoisting scheme on many occasions. The Sinopec Fourth Construction Company, which is responsible for the hoisting construction task, uses its own developed 2500 tons portal hydraulic pressure. The lifting system was used as the main crane. At the same time, the 750-ton caterpillar crane was used for tail-sliding cooperation. From the early morning on the 31st to 6:30, the smooth operation was continued for 9 and a half hours and the tower was successfully lifted into place. It is reported that this lifting is also the last lifting operation of the 2,500-ton portal hydraulic lifting system of Sijian Construction Co., Ltd. in Fujian Refining and Ethylene Engineering. The tower's successful installation marks the only giant door hanger in the country at the integration site. Successfully completed the mission.
During the lifting process, Wu Wenxin, director of the Fujian Refining and Ethylene Project, and the relevant personnel of the project's joint management team, the chiefs of the hoisting general contractors and construction units visited the site to instruct and instruct the hoisting construction.

Inorganic Salt

Chloride, Salt

YIBIN PERFEC INTERNATIONAL TRADE CO.,LTD , https://www.yibinbofei.com