Mold Incubator Operation Procedure

How should the mold incubator be used? The following will be detailed by Shanghai Yuzhuo technicians for you:

Mold incubator operating procedures:

1 Power on: Insert the power plug of the unit into the power socket, press the power switch on the panel, and the switch light is on, indicating that the power is on.

  
2 Press the lighting switch on the panel, the switch indicator is on, and the lighting in the cabinet is on. Press the light again to go off.
  
3 temperature controller menu operation:
  
4 In the instrument running state, the upper main screen displays the measured value and the lower payment screen displays the set value.

The mold incubator operating procedures are provided by Shanghai Yuzhuo.
  
5 If you want to change the setting, press the SET button, then pay the door lock, then press the â–³, â–³, â–³ keys to set the desired temperature control value. After setting, press SET key again, then the instrument enters the newly set control program to run.
  
6 Upper limit alarm setting: Hold down the SET key for several seconds until the main screen displays RL1. When the pay screen blinks, press the â–³, â–³, â–³ keys to set the desired upper limit alarm value. Press the SET key to complete the setting.
  
7 Lower limit alarm setting: Press and hold the SET button for several seconds, wait until the main screen displays RL1, then press the SET button to display the RL2 on the main screen, and the pay screen flashes. Press the key to set the lower limit alarm value. Press the SET button again to complete the setting.
  
8 After setting the upper and lower limit alarms, press and hold SET for a few seconds until the main screen displays the measured values. After the set values ​​are displayed on the screen, the instrument operation is completed. The machine enters normal operation.
  
9 The incubator should always be kept clean. Never use any chemicals such as acid, chemical dilution, gasoline, benzene, etc. to clean any part of the tank.
  
10 If there is a failure, contact the manufacturer in time for the three-pack period (within one year).
  
11 In the course of use, when a sudden power failure is encountered, the power plug must be unplugged and powered on at least 5 minutes later.
  
12 Before turning on the machine for official use, clear the operating procedures before using it.
  
13 The enclosure must be effectively grounded to ensure safe use.
  
14 Cleaning: Clean the inside of the incubator every month, disinfect it with disinfectant, and clean the outside surface with a clean, slightly damp rag.
  
15 Maintenance and Maintenance: Check the operation of the compressor every week to ensure that the equipment is in good lubrication condition.
  
16 maintenance of the instrument: Please repair the manufacturer's maintenance personnel.
  
17 Microbiological inspectors check the operation of the instrument on the morning and afternoon of each working day and fill in the usage records.
  
Precautions:
  
1 The instrument must be placed on a sturdy, level surface to avoid unnecessary trouble during operation. The power supply should be reliably grounded to ensure safety.
  
2 Incubator doors should not be opened frequently and should not be open for long periods of time.
  
3 The incubator should be large enough.

CYPR generator set Piston Ring is focusing on high-end genset market, the main OEM customers are Cummins, Weichai Power, Yuchai Group, etc.

The piston ring material includes cast iron (ductile cast iron, high alloy cast iron and alloy cast iron) and steel (stainless steel, carbon steel, alloy steel), the advanced coating, e.g. CCC, CDC and PVD are widely used. CYPR high performance piston ring has a good wear resistance, high (thermal) scuff resistance, long lifetime and superior fuel economy.

Genset Piston Ring

Genset Piston Ring,Genset Motor Ring,Piston Ring Set,Genset Special Purpose Ring

ASIMCO Shuanghuan Piston Ring (Yizheng) Co., Ltd. , http://www.cypr-pistonring.com